The crew was there sanding the floors while he was changing locks. The floors look really good. Donald had completely pulled out the old stove while I was at work and there are definitely pine floors underneath. I called NuNu to give me an estimate so I can get those refinished as well. He promised that everything will be done by the end of next week and that Monday they would rip up the linoleum in the kitchen and bleach out any dark areas that needed to be done. I didn't do much else.
Subscribe via email
I will be using this blog to chronicle all of the work currently being done on my new home in Richmond, VA. I am 23 and I am actually buying a house on my own. I will be doing as many of the repairs myself as I can. Please feel free to comment. Subscribe above to be emailed any time I update.
Friday, July 3, 2009
7/2/09 A Quiet Moment
I scooted over this afternoon to give Donald the keys and to check out what was going on. Donald has almost completed all of the locks. He filled the hole in the front door that was left from the old knob with PC Woody so we just need to wait for that to dry before sanding and repainting. Other than that, all knobs are on!
Subscribe to:
Post Comments (Atom)




No comments:
Post a Comment